About the project
About the project
What is the Caloundra Transport Corridor Upgrade project (CTCU)?
A road upgrade and new extension is being delivered between Omrah Avenue and Nicklin Way. The 1.6 kilometre CTCU has been planned since the early 2000's and will improve connectivity and travel choice into Caloundra by creating a new connection into the Caloundra CBD and reducing traffic congestion at the Caloundra Road/Nicklin Way roundabout and on Nicklin Way and Pelican Waters Boulevard.
This major transport infrastructure investment is the next step in meeting the current and future needs of motorists, cyclists, pedestrians and public transport users in Caloundra.
It is being delivered by Sunshine Coast Council, the Australian Government and Queensland Government (through the Department of Transport and Main Roads).
Where is the CTCU?
The 1.6 kilometre CTCU route runs between Omrah Avenue and Nicklin Way.
The CTCU is made up of two sections:
- Section 1 between Omrah Avenue and Arthur Street, along Gosling Street, Oval Avenue and Third Avenue. This section is being delivered by Sunshine Coast Council.
- Section 2 between Arthur Street and Nicklin Way (referred to as the Nicklin Way/Third Avenue extension). This section is being delivered by the Queensland Government, Transport and Main Roads.
What will the CTCU include:
The 2021 concept design shows the CTCU as including:
Section 1
- Duplicating existing traffic lanes in each direction on Oval Avenue and Third Avenue Connecting Oval Avenue with Omrah Avenue
- Building a two-way cycle track and pedestrian pathways
- Upgrading the following intersections to traffic signals to improve safety and traffic operations:
- Bowman Road/Gosling Street
- First Avenue/Oval Avenue
- Third Avenue/Oval Avenue
- Arthur Street/Third Avenue
- Making changes to traffic movements at the following locations:
- First Avenue, Second Avenue and Third Avenue intersections with Oval Avenue
- Nicholls Street and Gosling Street intersection
- Suller Street, Cowan Street and Omrah Avenue intersections with Bowman Road
- New street lighting and landscaping.
Section 2
- A new intersection connecting Nicklin Way and Third Avenue.
- An alternative entry into the Caloundra CBD and reducing congestion at the Caloundra Road/Nicklin Way roundabout.
- Extension of Third Avenue from Arthur Street to Nicklin Way.
- A connection to Oval Avenue, which will be duplicated by Sunshine Coast Council, to improve traffic flow.
- New bike riding facilities and pathways to improve access to Caloundra via active transport.
All elements are subject to detailed design.
What is the budget for the project?
Section 1 will be delivered and funded by council to meet local growth and community needs. It is estimated to cost $19.6 million.
Section 2 is part of the $18.2 million upgrade to the Nicklin Way-Third Avenue Connection with the Australian Government committing $7 million under the Infrastructure Investment Program, the Queensland Government $7 million and Council $4.2 million.
Will there be active transport improvements?
The CTCU is consistent with the community’s vision to get people out of cars and adopting more sustainable modes of transport, including walking, cycling, electric vehicles and public transport. Prioritised active transport facilities including a separated two-way cycle track, pedestrian pathways, new street lighting and landscaping all form part of the corridor.
The project has been designed to deliver improved walking and cycling infrastructure adjacent to a low-speed traffic environment (typically 50km/h). The CTCU will also provide for more efficient and reliable public transport services.
The project team remains committed to exploring further opportunities to prioritise safe and efficient travel for active transport users along and across the corridor.
This upgrade aligns with the Sunshine Coast Active Transport Plan 2010-2031. Active transport helps deliver improved mobility, safer streets, healthier residents and reduced impact on global climate, all resulting in a world-class quality of life.
The upgrade will deliver:
- Over 1.6 kilometre of two-way cycle track that creates a direct, pleasant and safe cycling environment to and from Caloundra’s city centre for all levels of cyclists.
- Signalised crossing facilities at six locations along the corridor improves the safety and amenity provided to pedestrians and cyclists.
- Significantly improved community connectivity and safety by providing a safe crossing of Nicklin Way for pedestrians and cyclists mid-way between Queen Street and Caloundra Road.
- Significant landscaping to improve the corridor’s amenity and create a more enjoyable outdoor experience particularly for pedestrians and cyclists.
What is the timeline of the project?
The CTCU is a multi-stage project. The proposed timeline includes:
- 2021 – Community feedback sought on concept design
- Late 2022 – Detailed design tender awarded and detailed design progressed
- Late 2023 – Detailed design completed and shared with community
- *Late 2023 to 2024 – Construction of section 1 and 2 (including early works)
- *Late 2025 – Completion and opening of the new transport corridor.
* Weather and site conditions permitting.
A construction program and more information will be provided closer to work commencing.
This timeline and all information about the project is accurate at the time of distribution. Project outcomes including design, works and dates may be subject to change due to circumstances beyond Council’s control.
Why does the Caloundra CBD need a transport corridor?
Without this upgrade, travel time, traffic congestion and access to active and public transport in Caloundra will continue to worsen as our community grows. In fact the RACQ has recently named Caloundra Road the fourth worst congested road in South East Queensland.
The new connection and upgrades to existing infrastructure will provide for development and growth within Caloundra as identified in the Sunshine Coast Planning Scheme. The CTCU has been considered in the context of many projects and strategies including the Caloundra Centre Master Plan and Integrated Transport Strategy and Local Government Priority Infrastructure Plan, amongst others.
It is vital that access to Caloundra is improved through projects such as the CTCU, before anticipated future projects and additional Caloundra development occurs. It is best practice to design a fit for purpose transport corridor that will meet the forecasted demand over the next 10-15 years.
What is the Caloundra Centre Master Plan?
The purpose of the Master Plan is to create an integrated plan for Caloundra Centre, to encourage future development in keeping with the vision for the area. The Master Plan generally covers the area from Bulcock Beach to the Caloundra Golf Club and from the Nicklin Way to Canberra Terrace. Caloundra Centre has a strong relationship with and links to adjoining beach communities, particularly Kings Beach and Golden Beach.
It is vital that access to Caloundra is improved, through projects such as the CTCU, before this anticipated future development occurs.
For more information about the master plan, please visit council’s website: Caloundra Centre Master Plan.